Austin, TX 2014
PRODUCT(S): MP Grout
The extensive 92 acre, $508 million project includes the water treatment plant, a water transmission main tunnelled into hard rock and 2 raw water tunnels, 9 feet and 7 feet in diameter. MP Grout was chosen to set and seal the filter channels in the media filter tanks.
Download Project Profile
MP Grout
High Flow, High Strength, Non-Shrink, Non-Corrosive Grout