Oregon 2009
PRODUCT(S) USED: HE Grout, CS-25-1315

Several upgrades were needed at the dam including the replacement of the dam’s first powerhouse tailrace gantry crane rails and upgrades to the deck hatches.

Download Project Profile

HE Grout
High Early Strength, Non-Shrink Grout

CS-25-1315
UV Stable, Solvent-Based Acrylic Cure & Seal (25% Solids)

bonneville dam