Utah DOT 2010
PRODUCT(S) USED: MP Grout

This DOT Payson Bridge Deck Replacement project implemented Utah’s Accelerated Bridge Construction program which is shaping bridge construction for the future.

Download Payson Bridge Deck Replacement Project Profile

Transpatch
High Strength Patching Compound

GP Grout
High Strength, Non-Shrink, Non-Corrosive Grout

Payson Bridge Deck Replacement