Denver, CO 2014
PRODUCT(S) USED: NA-50
This Peoria Crossing post-tension bridge needed a grout that met several physical requirements including having a fluid consistency, ease of long distance pumping, an extended working time and a specific strength. NA-50 was chosen because it met these requirements.
Download Peoria Crossing Project Profile
PT Grouts
PT Grout products offered by US SPEC