Castle Rock, Colorado 2020PRODUCT(S) USED: MP Grout, Quickset, Ezkote Green, Maxcure Resin Clear

To deal with the growing population of Castle Rock, Colorado, more capacity was needed for treating water. This water purification facility is designed to deliver a maximum daily production of 3-4 million gallons per day (MGD) in the short-term. Production capacity will be expandable to 12 MGD in the future. The Plum Creek facility now can purify multiple raw water sources to meet drinking water standards, including renewable indirect-reuse water and direct-reuse water.

Download Project Profile

MP Grout
High Flow, High Strength, Non-Shrink, Non-Corrosive Grout

Quickset
Rapid Setting Repair Patch

Ezkote Green
Multi-Use, Non-Petroleum, Reactive Form Release

Maxcure Resin Clear
Water-Emulsion, Dissipating Resin Curing Compound

Plum Creek Water Purification Plant